2 articles
The solid rocket motor crisis is not a producer-power story. The Pentagon is acquiring allocation authority through equity stakes, framework agreements, and subsidized second sources. The rent is at the sub-tier chemical and component layer, where genuine single-source status persists.
U.S. interceptor consumption exceeds industrial output. This analysis maps the six physical constraints between appropriations and finished missiles, separating real capacity expansion from nominal demand.