Economic rent in multi-shoring corridors accrues to the non-replicable physical nodes — power interconnection, cross-border rail, dry ports, bonded zone licenses — that gate factory operations, not to the factories themselves. The mechanism is a build-time asymmetry: factory capacity scales linearly with capital, while chokepoint capacity scales in discrete increments gated by permitting, land acquisition, and sovereign approval.
India is building the transport and power systems required by a much larger economy. But private investment, upstream supply chains, and manufacturing data do not yet support comparisons with China.