Economic rent in multi-shoring corridors accrues to the non-replicable physical nodes — power interconnection, cross-border rail, dry ports, bonded zone licenses — that gate factory operations, not to the factories themselves. The mechanism is a build-time asymmetry: factory capacity scales linearly with capital, while chokepoint capacity scales in discrete increments gated by permitting, land acquisition, and sovereign approval.
Retired power plants, aluminum smelters, and industrial sites are gaining value because they already have high-voltage grid connections that can take years to replicate. The opportunity depends on whether regulators preserve the advantages of these existing interconnections.
GAO data shows 76% of IIJA funds obligated but only 54% disbursed. The binding constraint is institutional throughput: engineering, permitting, environmental review, and public-sector delivery capacity.
The semiconductor supply chain is not a policy debate — it is a physical constraint. Advanced packaging, equipment tooling, and rare earth processing cannot be duplicated instantaneously. The irreversible timeline for strategic decoupling is approximately 2028-2032.